Level 1 ASPs

Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.

  • Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
  • Critical information updates; and
  • Other useful and relevant information

If you need further information or support, please email aspinfo@essentialenergy.com.au

Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.

  • Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
  • Critical information updates; and
  • Other useful and relevant information

If you need further information or support, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Christmas and New Year Planned Outages & Contestable Works

    supporting image


    What is Happening?

    To minimise the disruption to customers during the Christmas / New Year period, no planned interruptions with a customer impact will be scheduled from 22 December 2018 to 6 January 2019.

    Also Contestable Works will be closed during the same period with business resuming as normal from 7th January 2019.

    What do you need to do?

    1. Review your planned interruption schedule for the dates above and work with your nominated Local Depot Switching Resource to reschedule where required
    2. Minimal processing of emails/documentation or Asset Labels will occur from Contestable Works mailbox during the above mentioned period
    3. Communicate this information to relevant members of your organisation

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Reissue SB-793 Update to CEOP2377 Equipotential and Personal Protective Bonding

    supporting image


    Amendments have been made as a result of a recent review of Essential Energy’s Operational Procedure: CEOP2377 Equipotential and Personal Protective Bonding. Details of the amendments made can be viewed in section 10 of CEOP2377.

    The most notable changes include:

    • reference to ‘similar sized fitting’ removed
    • reference to ‘collar clamp’ removed, and
    • added requirement when working on a timber pole with a Known Permanent Earth (KPE), to install an additional bond to a pole step below the level of the workers feet.

    What do you need to do?

    1. Review Safety Brief 793_ASP - Update to CEOP2377 Procedure located on Essential Energy's Document Library
    2. Communicate this information to relevant members of your organisation

    Further information

    For further enquiries please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Safety Brief SB-810 Endeavour Energy HV cable strike and ARC flash incident

    supporting image


    A recent incident occurred where an Endeavour Energy contractor hit a live High Voltage (HV) underground cable during excavation works with a hand-held power tool.

    The contractor was engaged to prepare a trench as part of an overall program to replace Consac cabling. The Worker was in the trench, clearing material from around the base of a column using a hand-held power tool. The power tool penetrated the wall of the trench, striking a live 11kV cable and an arc fault occurred, the worker received burns to his arms and face.

    Contract workers and Endeavour Energy crews working nearby provided assistance to the injured contractor, who was transported to Royal North Shore Hospital for treatment.

    The initial reports suggest the worker suffered burns to his arms and face which may require a skin graft, however there did not appear to be nerve damage.

    What do you need to do?

    1. Review SB-810 Endeavour Energy Cable Strike and ARC Flash Incident located on Essential Energy's Document Library
    2. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Safety Brief SB-811 CONSAC Cable Identification

    supporting image


    A recent incident occurred where an on-call crew did not identify CONSAC cable correctly, special requirements apply to equipment containing CONSAC cables – workers should review and implement the requirements of CEOP8030.

    An on-call crew were called to a no supply, after inspection it was determined it was in a burnt-out service fuse and street light fuse in a pillar. After completing a risk assessment and discussing the job the service fuse carrier was replaced and supply restored to the house. The on-call crew didn't have a fuse carrier for the street light, so it was made safe and left for another day. All appropriate PPE was utilised.

    What do you need to do?

    1. Review SB-811 CONSAC Cable Identification located on Essential Energy's Document Library
    2. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Reminder Essential Energy ASP Forums October 2018

    supporting image


    As part of our commitment to improve our relationship and communications with ASPs Essential Energy are looking at holding forums in regional areas in October. The purpose of these forums is for ASPs to come along and hear about the latest news in the ASP space and to ask questions or raise issues with representatives from various Essential Energy teams, including the safety team, design and certification and training amongst other teams in our business.

    Dates and locations of ASP forums:

    • Port Macquarie 3rd October 2018 (The Westport Club - 25 Buller St Port Macquarie)
    • Lismore 4th October 2018 (Lismore Workers Club - 231 Keen St Lismore)
    • Dubbo 10th October 2018 (Quality Inn Dubbo International - 165 Whylandra St Dubbo)
    • Bathurst 11th October 2018 (Bathurst City Community Club - 29 William St Bathurst)
    • Albury 15th October 2018 (The Albury Club Ltd - 519 Kiewa St Albury)
    • Wagga Wagga 16th October 2018 (The Rules Club - Cnr Fernleigh & Glenfield Rds Wagga Wagga)

    Forums will commence from 6pm at the above locations, with light refreshments available. To determine venue sizes we would appreciate any ASPs who wish to attend complete a survey or email aspinfo@essentialenergy.com.au with company name, numbers attending, which forum you will be attending and anything you would like to see at our forums.

    Brief Agenda Items:

    Part 1 - 90 mins

    • Welcome and General ASP Information - what we have done since David Wilson arrived and what the future looks like with Enzen
    • Safety and Authorisation information
    • Level 3 Design Certification - update on changes and future work being undertaken in the area
    • Asset Inspection - Defect trends identified
    • Level 2 portal and SWF information - what information ASPs need to load in to our systems to make sure work is progressed and changes to what we require
    • Update on Standards
    • Training Requirements
    • Tyree Presentation

    Part 2 – 60 mins

    • Subject Matter Experts (SME) spread across the room allowing ASPs to meet key people and discuss issues

    Thank you to those that have already expressed interest in attending our forums.

    What do you need to do?

    1. Please complete the survey at engage.essentialenergy.com.au/ASP click on your relevant ASP level, then go into Surveys & Forms
    2. Communicate this information to relevant members of your organisation

    Further information

    If you need further information, please email aspinfo@essentialenergy.com.au
  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Reminder ASP Registration and Authorisation for Non-Electrically Qualified Workers

    supporting image


    On 9th September 2016, the NSW Government gazetted changes to the NSW Accredited Service Provider (ASP) Scheme Rules (the Scheme). This revision introduced new Level 1 and 2 classifications for non-electrically qualified personnel (Class 1X or Class 2X – Non-electrically qualified).

    ASPs must ensure all non-electrically qualified workers are registered with the Scheme prior to submitting an authorisation application to Essential Energy; this includes both initial authorisations and renewal of existing authorised workers.

    Essential Energy will, on receipt of a valid and successful applications, authorise the ASP worker(s) aligned to the new class(es) of accreditation and issue a new authorisation card.

    What do you need to do?

    1. Review the briefing paper titled ‘20180910_Briefing - Non-Electrically Qualified Workers’ located on Essential Energy's Document Library
    2. Communicate this information to relevant members of your organisation

    Further information

    If you need further information, please email authorisations@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Essential Energy ASP Forums October 2018

    supporting image


    As part of our commitment to improve our relationship and communications with ASPs Essential Energy are looking at holding forums in regional areas in October. The purpose of these forums is for ASPs to come along and hear about the latest news in the ASP space and to ask questions or raise issues with representatives from various Essential Energy teams, including the safety team, design and certification and training amongst other teams in our business.

    Dates and locations of ASP forums:

    • Port Macquarie 3rd October 2018
    • Lismore 4th October 2018
    • Dubbo 10th October 2018
    • Bathurst 11th October 2018
    • Albury 15th October 2018
    • Wagga Wagga 16th October 2018

    Forums will commence from 6pm at the above locations, with light refreshments available. To determine venue sizes we would appreciate any ASPs who wish to attend complete a survey or email aspinfo@essentialenergy.com.au with company name, numbers attending, which forum you will be attending and anything you would like to see at our forums, further information on the content of the forums will be provided closer to the events.

    What do you need to do?

    1. Please complete the survey at engage.essentialenergy.com.au/ASP, click on your relevant ASP level, then go into Surveys & Forms
    2. Communicate this information to relevant members of your organisation
    Further information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Opportunity to meet Scott Steele from Tyree Industries

    supporting image


    Opportunity to meet and discuss issues with Scott Steele, Tyree Industries

    Tyree Industries wants to engage with Level 1 ASPs within Essential Energy network area who utilise pole mounted transformers and substation pads procured from Essential Energy and other suppliers.
    To facilitate this, Scott Steele has been appointed as the senior contact within Tyree Industries.
    Scott plans to do a road trip to meet with Level 1 ASPs to better understand your needs and any issues associated with the procurement process.
    In the meantime, Scott will be happy to assist with any questions you have and can be contacted via:

    Scott Steele
    General Manager Sales & Export
    Tyree Industries
    T: 02 4872 6177

    Scott Steele

    Based in Mittagong in the NSW Southern Highlands, Scott has been General Manager Sales & Export with Tyree Industries for the last six years.
    He has over 25 years’ experience with global multi-national manufacturers in various roles, including selling MV/HV switchgear and protection products, distribution and power transformers up to 550KV, 500MVA and turn-key substations.
    Scott also has experience in running a service and installation company, looking after products from cradle to grave.


  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Ring Fencing – Provider of Last Resort

    supporting image


    Ring Fencing – Provider of Last Resort

    Ring-fencing regulations were introduced on 1 January 2018 to support the creation of a level playing field for providers of contestable services in new and existing NSW markets.
    Essential Energy is only able to provide contestable services in limited circumstances:

    • In regionally exempt depots; or
    • Where acting as a provider of last resort
    If a customer is unable to obtain the services of a third party, they may request that Essential Energy undertake the work as a Provider of Last Resort.
    For more information relating to Ring Fencing – Provider of Last Resort please download the Q & A’s located on our Document Library.

    What do you need to do?
    1. Review & download the Provider of Last Resort Q & A’s located on Essential Energy’s Document Library
    2. Communicate this information to relevant members of your organisation
    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au
  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Distribution joint and termination installation new training sessions

    supporting image


    Important reminder to authorised cable jointers

    As previously advised, the Standard for installing distribution joint and termination equipment has been updated and has become mandatory from 1 July 2018.

    Additionally, Essential Energy will limit the choice of distribution joint and termination items for installation on our network to those supplied by DT Jointing Solutions Pty Ltd, and require you to use the QR code process for any joint or termination installed.

    If you hold a cable jointing authorisation and to date if you have not completed the awareness training required to gain approval to install new DT joints on our network. You are now unable to continue to perform cable jointing on our network, until you complete this awareness training.

    We are scheduling two more free courses that will be held in the below locations:

    • Goulburn 11 September 2018
    • Grafton 4 September 2018

    You are encouraged to make contact ASAP to enrol, as we have not scheduled any future sessions for this course.

    What do you need to do?

    1. Please register your interest in attending a training course by contacting our Training Team, via email to trainingservicesadmin@essentialenergy.com.au, as soon as possible and include your full name, location and authorisation number.
    2. Communicate this information to relevant members of your organisation

    Once minimum numbers are achieved to run these courses, an invitation and course confirmation will be provided.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

Page last updated: 23 Apr 2024, 03:35 PM