Level 3 ASPs
Level 3 ASPs design overhead and/or underground distribution and Sub-Transmission network assets. If you need further information or support, please email aspinfo@essentialenergy.com.au.
Important Document Links:
Click here for the Design and Certification Officer Contact List
Level 3 ASPs design overhead and/or underground distribution and Sub-Transmission network assets. If you need further information or support, please email aspinfo@essentialenergy.com.au.
Important Document Links:
Click here for the Design and Certification Officer Contact List
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy Network Data Access for Level 3 ASPS - Power Lines Pro
What is happening?
In July 2020 Essential Energy made a 3D model of our overhead network, construction libraries and LiDAR data available to Level 3 ASPs. This information is available to access for Accredited Service Providers who are registered 3A and/or 3B employees with the NSW Department of Planning, Industry & Environment. If this is you, then you have the option to request access through Power Lines Pro – a third party an online platform for power line design.
Before access to Essential Energy’s 3D model on the Power Lines Pro platform is granted you will need to be registered for the BetterConnect Portal. Access to the BetterConect Portal is free. If you do not have access to the BetterConnect Portal please email aspinfo@essentialenergy.com.au, requesting registration to the BetterConnect Portal.
If you are already registered for the BetterConnect Portal please complete the ‘Access Request for Power Lines Pro’ form and submit to aspinfo@essentialenergy.com.au. Once received your request this will be processed, and you will gain access.
Further Information
Further information on Power Lines Pro and the 3D Model can be found on Essential Engagement, under Digital Asset Management.
Visit the Power Lines Pro website - especially their support pages, for further information, FAQs, tutorials, troubleshooting and access to the community forums at: https://www.powerlinespro.freshdesk.com/support/home.
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Clarification of variations to CEOM7206.04 Standard Streetlight Footing Designs
Background
Following recent questions, we have outlined below what Essential Energy requires to accept requests for variations to CEOM7206.04 streetlight footing designs.
Certification of variations
Prior to submitting a streetlight footing design to Essential Energy that varies from CEOM7206.04 (e.g. with alternative cage designs, depth, etc), Level 3 ASPs must ensure the design has been certified by a suitably qualified civil engineer, and provide a copy of this certification to Essential Energy as an accompanying letter. The alternative design can then be certified with the original submission.
At the time of construction, if a Level 1 ASP requests a variation to a plan certified by Essential Energy, variations will need to be resubmitted for re-certification by the Level 3 ASP. Any variations will incur the standard fees charged by Essential Energy.
Please also note that variations identified within ‘As-Built’ drawings or designs may not be accepted by Essential Energy.
Future improvements
If you have any feedback about our existing Standard/s, or suggestions for future improvement, such as potential cost reductions or efficiency gains that could be achieved without impacting quality or safety, please send them to aspinfo@essentialenergy.com.au for consideration on future revisions.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Register for Training – Power Lines Pro - Module 4 Construction Schedules
What is happening?
Essential Energy has made further improvements to Power Lines Pro to enhance the user experience for Accredited Service Providers (ASPs).
Module 4 Construction Schedules will soon go live.
The aim of the Construction Schedules enhancement is to drive efficiency by automating the construction and conductor schedule for ASPs creating and submitting designs in Power Lines Pro.
The training session will provide a demonstration including:
- Automated construction schedule
- Automated conductor schedule
- Constructions that are not yet available to be updated in the future
A How to Guide will also be provided.
To ensure that you have everything you need to utilise this enhancement, we are offering an hour-long training session:
- Session 1: Tuesday, 24 November 2020 at 1.00pm
- Session 2: Wednesday, 25 November 2020 at 1.00pm
- Session 3: Thursday, 26 November 2020 at 1.00pm
Please email aspinfo@essentialenergy.com.au with your preferred session and we will email you the Zoom information.
Please watch the short video under Digital Asset Management to see what Module 4 Construction Schedules in Power Lines Pro can do.
An overview of the enhancement will also be provided at our Accredited Service Provider (ASP) Forums scheduled between the 4 and 10 November 2020.
What do you need to do?
- Review the Powerline Pro demonstration video under Digital Asset Management
- Communicate this information to relevant members of your organisation.
- Email aspinfo@essentialenergy.com.au with your preferred session by 20 November 2020
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Christmas and New Year Planned Outages and Contestable Works
What is Happening?
To minimise the disruption to customers during the Christmas / New Year period, no planned interruptions with a customer impact will be scheduled from 19 December 2020 to 3 January 2021.
Also Contestable Works will be closed during the same period with business resuming as normal from 4 January 2021.
Minimal processing of emails/documentation or Asset Labels will occur from Contestable Works mailbox during the above mentioned period.
What do you need to do?
- Review your planned interruption schedule for the dates above and work with your nominated Local Depot Switching Resource to reschedule where required.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Delays in Processing LV Connection Applications
Essential Energy is currently experiencing an increase in the volume of low voltage connection applications. This may result in our Connection Application processing being delayed by a few days. We apologise for any inconvenience caused and will endeavour to limit this delay.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy customer satisfaction research
As part of Essential Energy’s commitment to continuous improvement, we would like to receive your feedback on how easy you find it to do business with us.
As a key stakeholder we work with, your feedback will assist us in making sure that the capabilities and quality of our products and services are meeting your expectations now and into the future.
Over the next few weeks, a representative from Woolcott Research & Engagement may contact you to participate in a survey that will assess your satisfaction with our service and operational performance. We greatly value your input as this will help us to make improvements where there are opportunities to do so.
Further information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Contestable Work Design and Certification Manager Update
Essential Energy would like to share some staff movements which relate directly to the Design and Certification team – Darrin Edwards has moved into the role of Manager Connections Planning and Glenn Leman is now the Contestable Work Design and Certification Manager.
If you need to contact Glenn, his email is glenn.leman@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy ASP Forums: November 2020 via Zoom
What is happening?
To protect everyone’s health and safety, we’ll hold our next round of ASP engagement forums via Zoom, rather than face to face.
In this round, we’ll be covering a range of topics relevant to Level 1, 2 & 3 ASPs including connections, the Level 1 Agreement, CEOP2015, Standards and updates on BetterConnect and Power Lines Pro.
We encourage you to participate in these forums. You’ll have the opportunity to discuss our plans and initiatives, and to ask questions or raise issues with Essential Energy team members.
Dates and times
- Session 1: Wednesday, 4 November at 5.00pm
- Session 2: Thursday, 5 November at 12.30pm
- Session 3: Tuesday, 10 November at 5.00pm
All sessions will have the same content.
Please register your interest by emailing aspinfo@essentialenergy.com.au with individual(s) email addresses and preferred session(s) by COB 30 October 2020.
Zoom details will be emailed directly to the participant two days prior to the to the event.
What do you need to do?
- Communicate this information to relevant members of your organisation.
- Attend the zoom session that suits you.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Minor change to the Provider of Last Resort Process
Essential Energy will be removing the regional exempt areas from the Provider of Last Resort process for Level 1 and 3 Accredited Service Providers (ASPs), this will ensure that you have every opportunity to quote for Contestable Work jobs.
These will still be advertised on Essential Energy’s Document Library and there will be no change to the regionally exempt areas for Level 2 ASPs.
For more information please visit our Provider of Last Resort page on Essential Energy’s website.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Phishing emails update
Accredited Service Providers (ASPs) have brought to our attention phishing emails that appear to have been sent by Essential Energy’s BetterConnect Project email address.
Valid email addresses that our Network ASP team use to share communications with you are:
- Essential Engagement;
- aspinfo@essentialenergy.com.au;
- contestableworks@essentialenergy.com.au.
To maintain your cyber security, please check that any emails that appear to be from Essential Energy are valid.
What is a phishing email?
A phishing email is a fraudulent attempt to obtain your sensitive information by a sender disguising themselves as a trustworthy entity.
If you receive a phishing email, please take the following actions:
- Delete the email
- Do not open it and do not click on any links
- If you click on a suspicious link, we recommend you change all your passwords
- Do not forward the email.
You can also find more information on the Australian Cyber Security Centre: (https://www.cyber.gov.au/acsc/view-all-content/threats/phishing )
What do you need to do?
- Review the above and remain vigilant for phishing emails.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
Who's Listening
-
Phone 02 6933 5956 Email hamish.wheatley@essentialenergy.com.au
Essential Connections
Digital Asset Management
-
What's New?
-
Whats new - June 2025 (378 KB) (pdf)
-
Reports to assist with unspecified status and asset labels (381 KB) (pdf)
-
Reports to assist with Unspecified Status and Asset Labels (35.2 MB) (mp4)
-
Change to Nearas Pole Library Configuration (347 KB) (pdf)
-
Updated Neara User Interface (24.7 MB) (mp4)
-
How to update an old Neara design-User Guide (1.52 MB) (pdf)
-
How to update an old Neara design - Video (23.3 MB) (mp4)
-
-
Getting Started
-
01 Getting Started - what you need to access Neara our network model and Lidar data (759 KB) (pdf)
-
02 How to log in to Neara and access our Network Model and Lidar data (994 KB) (pdf)
-
03 Level 3 Access Request to Neara (19.5 KB) (xlsx)
-
04 Getting Started with Neara (61.8 MB) (mp4)
-
05 Request access to Essential Energys network model and LiDAR data for a given area (105 MB) (mp4)
-
-
General Navigation of Neara
-
01 General Navigation of Neara (3.99 MB) (pdf)
-
02 Mouse Controls and Keyboard Shortcuts - video (112 MB) (mp4)
-
03 Customise Neara screenlayout and workspace (102 MB) (mp4)
-
05 Searching by an Asset Label or an Asset ID (102 MB) (mp4)
-
04 Search in Neara by location (74.8 MB) (mp4)
-
06 Finding a Design (34.6 MB) (mp4)
-
07 Using the Libraries in Neara (78 MB) (mp4)
-
08 Properties Panel (132 MB) (mp4)
-
-
Understanding LiDAR
-
Overhead Design
-
01 A 28-Step Guide to using Neara and Essential Energys Network Model for ASPs (3.09 MB) (pdf)
-
02 Creating an Overhead Design with Neara (2.98 MB) (pdf)
-
03 Guidelines for using Essential Energys Foundations Checks (2.23 MB) (pdf)
-
04 Overhead Design Buttons (117 MB) (mp4)
-
05 Adding a Stay (107 MB) (mp4)
-
06 Using the Environments Spreadsheet (48.5 MB) (mp4)
-
07 Adding a Transformer and Associated Pole Substation (61.6 MB) (mp4)
-
08 How to Use EE Attached Crossings Checks (49.1 MB) (mp4)
-
09 How to use the clearance report (61.8 MB) (mp4)
-
10 Strength Checks (121 MB) (mp4)
-
11 Designing Side Stays in Neara (965 KB) (pdf)
-
12 Guidelines for Essential Energys Swing angle Check in Neara (1.12 MB) (pdf)
-
13 Flag is loaded in master model template (7.04 MB) (mp4)
-
-
Automated Overhead Construction and Conductor Schedules
-
Underground Design
-
Section 1_ Introduction and Update
-
Section 2_ Using the UG Tools
-
Section 3_ Design Example and Pulling Calculation
-
Section 4_ Voltage Drop Calculations
-
How to Use the Underground Design Tools in Neara (2.95 MB) (pdf)
-
Neara Underground Design - Voltage Drop Calculations (445 KB) (pdf)
-
Neara Underground Design Example - How to Design Underground Reticulation for a New Residential Estate (10.1 MB) (pdf)
-
How To Set The Coefficient of Friction in Neara (1.58 MB) (pdf)
-
Neara UG - Voltage and Current Calculations_update (661 KB) (pdf)
-
Underground Design Example (993 KB) (zip)
-
-
Additional Neara Resources
Information
-
Safety Briefs/Alerts
-
Briefing – CEOM7098 issue 16 - Underground Design manual changes (382 KB) (pdf)
-
ASP Underground Manual update session Aug 2024 (312 KB) (pdf)
-
Bushfire Priority Zone Transition BFP ASP Comms (101 MB) (mp4)
-
Essential Energy - Digital Identification User Guide (1.87 MB) (pdf)
-
Policy
-
Essential Connections Portal Preview (1.21 MB) (mp4)
Construction News
-
2025
-
CN25-04 - R1100 Relay replacements for the R03 relays (205 KB) (pdf)
-
CN25-03 SafeLink II RMUs DJ-3100 Through Fault Indicators (348 KB) (pdf)
-
CN25-02 Lifting 33kV 1500kVA Padmount Substations - Amendment 1 (392 KB) (pdf)
-
CN25-01 Low Voltage Pillars (152 KB) (pdf)
-
CN24-03 Padmount Substations Optional 315 & 500kVA 11kV Amended February 2025 (143 KB) (pdf)
-
-
2024