Level 1 ASPs
Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.
- Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
- Critical information updates; and
- Other useful and relevant information
If you need further information or support, please email aspinfo@essentialenergy.com.au
Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.
- Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
- Critical information updates; and
- Other useful and relevant information
If you need further information or support, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Reminder – Cable Jointing Awareness Session must be completed by 15 August 2020
Reminder – Cable Jointing Awareness Session must be completed by 15 August 2020
Below is a copy of the communication sent on 11 June 2020. Please action prior to 15 August 2020, if you do not complete the training described below your Level 1 Authorisation will be suspended.
What is happening?
From 15 August 2020, your employees with Class 1B – Underground Paper Lead and Polymeric and Class 1C – Underground Polymeric only Authorisations must have completed a Cable Jointing Awareness session in order to remain authorised to work on or near our network.
Please ensure that all of your employees who have these authorisations complete an online awareness session prior to that date.
The awareness session is available on Essential Energy Learning Management System. To be able to access this system, you will need to:
- Complete an online registration
- The registration will require you to create a unique user ID (ie jsmith) and password.
- Email trainingservicesadmin@essentialenergy.com.au to request enrolment in CJA001 (CJ Awareness Session)
If you have any issues with your registration, please email ekas@essentialenergy.com.au.
What do you need to do?
- Ensure that all employees with 1B and 1C authorisations complete the awareness session prior to 15 August 2020.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
- Complete an online registration
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Safety Brief 924 Ausgrid Lineworker Shock from Streetlight Mains
Essential Energy would like to share an Ausgrid Health and Safety Alert where an Ausgrid lineworker received an electric shock from an overhead streetlight conductor that was still ‘live’ within their work area.
The details of this incident are contained in the Ausgrid Health and Safety Alert that forms page 2 of Essential Energy’s Safety Brief which is available on the Document Library and on Essential Engagement/ASP.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Reminder - Confirmation of Company Safety Systems for Live Low Voltage Work
Reminder Confirmation of Company Safety for Live LV Work
As communicated on 17 June 2020 Level 1 ASP companies need to action the below before completing live low voltage work on the Essential Energy network. If you require the Learning Module code it is ASPLLV.
Background
Following multiple incidents relating to live low voltage (LV) work, including accidents involving actual and potential life-threatening injuries to electrical workers which raise concerns about safe work management of live work, the Independent Pricing and Regulatory Tribunal of New South Wales (IPART) issued four Safety Alerts during 2019. The three NSW distributors subsequently reviewed their related work practices, controls and the competency of their workers. Some live low voltage work activities were suspended while these reviews were undertaken.
Accredited Service Providers (ASPs) also undertake live low voltage work under the relevant Regulatory provisions for Network Operators, including the NSW framework for Contestable Work (the ASP Scheme Rules).
ASPs undertaking live LV work
Where it is appropriate for an ASP to undertake live low voltage work, you must:
- ensure that appropriate planning processes and procedures are in place to work safety in a live work situation
- have control measures incorporated into live work procedures
- identify live work responsibilities, accountabilities and authority levels of personnel or contractors, and
- ensure that anyone involved in planning or undertaking the work is trained and competent.
What your company needs to do?
- ASPs who undertake contestable work on our network are aware of their legislative obligations regarding live work
- ASPs have reviewed and updated their safe work practices and controls in line with IPART Safety Alerts regarding recent live low voltage work industry incidents, and
- ASP workers who plan and undertake live low voltage work are competent to do so.
If you have not previously accessed Essential Energy Learning Management System. You will need to create a unique user ID (i.e. jsmith) and password as part of your registration through the link above.
If you have any issues with your registration, please email ekas@essentialenergy.com.au.
What do you need to do?
- The authorisation representative need to complete the confirmation section.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Project Compliance - Surveyor’s Advice Update
What is Happening?
To comply with section 2.12 of CEOP2015, all contestable overhead and underground projects that include easements and/or allocations such as road reserves and nature strips require a surveyor’s letter stating that the network assets gifted to Essential Energy are in the locations indicated on the certified plan/s.
The surveyor’s letter must be submitted on your company letterhead with the project completion document. To assist, an example letter can be found on the Document Library.
What do you need to do?
- Review the above and ensure these requirements are met.
- Communicate this information to relevant members of your organisation, customers and proponents.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
What does Yellow Tape mean when attached to an Essential Energy Asset?
Background
During the investigation of an ASP incident it was highlighted that Essential Energy need to raise awareness of what the Yellow Tape around specific poles represents.
The use of Yellow PVC Tape was introduced into Essential Energy’s practices at the start of 2017 to help identify a “Danger Tag” placed on Essential Energy’s Network.
A specific reference to the use of the yellow tape can be found in Essential Energy’s Electrical Safety Rules CEOP8030 – section 4.13.
4.13 Danger Tagging
‘Danger - do not operate’ tags must be attached to the controls of operable electrical apparatus to warn persons against inadvertent or unauthorised operation (that would endanger the safety of persons or the reliability and quality of supply) unless attachment to the controls is impractical. In such instances danger tags must be attached in the next best locations to affect the warning.
Danger tags associated with poles shall be attached using high visibility yellow PVC tape. Multiple danger tags can be applied with a single tape.
Danger tags are also used to secure a customer’s installation in accordance with CEOP2018 – Polarity and Neutral Identification: Testing. ASP’s or CSP’s utilising an alternate industry standard may use alternate methods to secure a customer’s installation.
‘Danger - do not operate’ tags must only be installed, altered or removed by authorised persons.
‘Danger - do not operate’ tags must also be fitted to unserviceable equipment to warn against inadvertent energisation.
Persons shall not remove or alter in any way applied danger tags without consulting the System Operator or person who attached the danger tag.
What do you need to do?
- Ensure you always look at the most recent version of the Electrical Safety Rules on the Document Library.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Follow up reminder – completing paperwork and non-conformances for FY 2019-20
Friendly reminder
As per our communication on 1 June 2020 Essential Energy are requesting that all paperwork is submitted prior to 1 July 2020.
Previous communication
To assist Essential Energy in ensuring that all work completed and commissioned in the 2019-20 financial year is correctly recorded and closed in our systems, we are asking you, where practical, to please send all required paperwork.
We are also requesting that you submit a schedule to rectify all outstanding non-conformances prior to 1 July 2020. If you are unsure of your current outstanding non-conformance status, please contact your local NAF or SNAF (Network Assurance Facilitator).
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au, or alternatively contact your local NAF or SNAF.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Confirmation of Company Safety Systems for Live Low Voltage Work
Background
Following multiple incidents relating to live low voltage (LV) work, including accidents involving actual and potential life-threatening injuries to electrical workers which raise concerns about safe work management of live work, the Independent Pricing and Regulatory Tribunal of New South Wales (IPART) issued four Safety Alerts during 2019. The three NSW distributors subsequently reviewed their related work practices, controls and the competency of their workers. Some live low voltage work activities were suspended while these reviews were undertaken.
Accredited Service Providers (ASPs) also undertake live low voltage work under the relevant Regulatory provisions for Network Operators, including the NSW framework for Contestable Work (the ASP Scheme Rules).
ASPs undertaking live LV work
Where it is appropriate for an ASP to undertake live low voltage work, you must:
- ensure that appropriate planning processes and procedures are in place to work safety in a live work situation
- have control measures incorporated into live work procedures
- identify live work responsibilities, accountabilities and authority levels of personnel or contractors, and
- ensure that anyone involved in planning or undertaking the work is trained and competent.
What your company needs to do?
- ASPs who undertake contestable work on our network are aware of their legislative obligations regarding live work
- ASPs have reviewed and updated their safe work practices and controls in line with IPART Safety Alerts regarding recent live low voltage work industry incidents, and
- ASP workers who plan and undertake live low voltage work are competent to do so.
If you have not previously accessed Essential Energy Learning Management System. You will need to create a unique user ID (i.e. jsmith) and password as part of your registration through the link above.
If you have any issues with your registration, please email ekas@essentialenergy.com.au.
What do you need to do?
- The authorisation representative need to complete the confirmation section.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Request for Planned Outage, Connection or Work Live LV
Changes made to CEOF6013 – Outage, Connection & Work Live LV request from
Following recent incidents of outages extending beyond requested timeframes, Essential Energy has amended form CEOF6013 Request for Planned Outage, Connection or Work Live LV.
The new form will be available in the Document Library from 1 July 2020 and we request that you start using it immediately after that date.
Key changes to CEOF6013 Request for Planned Outage, Connection or Work Live LV are:
- The ASP must provide 5 days’ notice when they intend to work live LV.
- The ASP is to state the Access Permit duration time required to complete the work.
- A detailed description of works must be provided, including work areas and tasks to be undertaken.
- Additional fees will be applied for Access Permits outside of business hours.
- Outlines actions and responsibilities for the ASP when customers are affected by planned outages.
- Switching / commissioning officer has a checklist as a guide to assist with the contestable process.
Please familiarise yourself with the new form and the notes listed on page 2. If you have any questions, please contact your local Network Assurance Facilitator.
What do you need to do?
- Review the above key changes and submit CEOF6013 version 8 from 1 July 2020. The revised CEOF6013 form will be located in the Document Library.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Cable Jointing Awareness Sessions
What is happening?
From 15 August 2020, your employees with Class 1B – Underground Paper Lead and Polymeric and Class 1C – Underground Polymeric only Authorisations must have completed a Cable Jointing Awareness session in order to remain authorised to work on or near our network.
Please ensure that all of your employees who have these authorisations complete an online awareness session prior to that date.
The awareness session is available on Essential Energy Learning Management System. To be able to access this system, you will need to:
- Complete an online registration
- The registration will require you to create a unique user ID (ie jsmith) and password.
- Email trainingservicesadmin@essentialenergy.com.au to request enrolment in CJA001 (CJ Awareness Session)
If you have any issues with your registration, please email ekas@essentialenergy.com.au.
What do you need to do?
- Ensure that all employees with 1B and 1C authorisations complete the awareness session prior to 15 August 2020.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
- Complete an online registration
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Reminder – Returning Redundant Material
Background
To comply with heightened social distancing and safety practices in our Depots, it is important that all ASPs arrange a specific time to return redundant material from their site. Scheduling an agreed time is necessary to protect the safety of both our ASP partners and our employees.
CEOP2015 - Contestable Work Guidelines (available on the Document Library) details our requirements in the section “Return of redundant materials”. Please ensure that you follow these.
What do you need to do?
- Ensure that you have contacted the appropriate Depot to arrange a time to return redundant materials.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
Who's Listening
-
Phone 02 6933 5956 Email hamish.wheatley@essentialenergy.com.au
Essential Connections
Information
- Briefing – CEOM7098 issue 16 - Underground Design manual changes (382 KB) (pdf)
- Bushfire Priority Zone Transition BFP ASP Comms (101 MB) (mp4)
- Asset Testing and Commissioning Refresher - ASP Training Enrolment Guide (962 KB) (pdf)
- Composite Pole Journey and FAQ's (694 KB) (pdf)
- Essential Energy - Digital Identification User Guide.pdf (1.87 MB) (pdf)
- Policy/Documents
- Safety Briefs/Alerts
- Essential Connections Portal Preview (1.21 MB) (mp4)
Construction News
-
2024
- CN24-12 CEOM7104.20 Construction Standard Update - Pole Substation Fuse Crossarms Assemblies (138 KB) (pdf)
- CN24-11 Composite Pole CEOM7103 Stay Standards Update (151 KB) (pdf)
- CN 20-10 Correct Transformer Connections (469 KB) (pdf)
- CN24-10 CEOM5005 Chamber Substation Design and Construction Manual Update (154 KB) (pdf)
- CN24-09 11-22kV Schneider RM6 Switchgear Changes (1.52 MB) (pdf)