Level 1 ASPs
Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.
- Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
- Critical information updates; and
- Other useful and relevant information
If you need further information or support, please email aspinfo@essentialenergy.com.au
Level 1 ASP undertake work to extend the overhead and/or underground electricity network or increase the capacity of the existing network.
- Proactive discussions, engagement and insights from Level 1 Accredited Service Providers;
- Critical information updates; and
- Other useful and relevant information
If you need further information or support, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Safety Brief – SB-976_ASP Redmond Gary EWP Fly Boom Cylinder Pins
What is Happening?
This Safety Brief relates to two separate incidents below:
INC68429: Redmond Gary Elevated Work Platform (EWP) was being operated on a fault and emergency job on replacing lightning arrestors when the two employees aloft noticed clunking noises coming from the Fly Boom knuckle area. Employees grounded the EWP to check and found that one of the cylinder pins in the fly boom was dislodged. The pre-operation inspection completed did not reveal any issues with the Fly Boom knuckle.
INC68386: Whilst cutting trees the operators heard fibreglass scratching and cracking, when the Redmond Gary EWP fly boom was raised. After further inspection and removing guards, it was found that the pin that holds the fly boom to the hydraulic cylinder had worked its way loose.
What do you need to do?
- Download and review Safety Brief – SB-976_ASP Redmond Gary EWP Fly Boom Cylinder Pins located on the Document Library and Essential Engagement.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy ASP Forums: April & May 2021 via Zoom
What is happening?
To protect everyone’s health and safety, we’ll hold our next round of ASP engagement forums via Zoom, rather than face to face.
In this round, we’ll be covering a range of topics including safety, bushfire zoning and vegetation management, CEOP2015 Contestable Works Guidelines, inspection and assessment of ASP works. We will also be giving you an initiative updates on Design and Certification, Power Lines Pro and BetterConnect.
We encourage you to participate in these forums. You’ll have the opportunity to discuss our plans and initiatives, and to ask questions or raise issues with Essential Energy team members.
Dates and times
Click on one of the options below to reserve your preferred session (all sessions will have the same content).
- Session 1: Tuesday, 27 April 2021 at 5:00pm to 7:00pm
- Session 2: Thursday, 29 April 2021 at 5:00pm to 7:00pm
- Session 3: Tuesday, 4 May 2021 at 11:00am to 1:00pm
A confirmation email will be sent to you with the Zoom meeting details once you have registered.
What do you need to do?
- Select the session date above and reserve your spot to attend one of our forums.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Please review our updated CEOP2015 Contestable Works Guidelines
What is Happening?
Essential Energy’s revised CEOP2015 Contestable Works Guidelines contain a number of new and revised procedures.
Many of the changes to the procedures it describes have been informed through consultation with over thirty Level 1, Level 2 and Level 3 ASPs in a series of workshops held between June and September 2020.
In response to their feedback, the content has been reorganised to support a logical, sequenced flow of information, and our network contestable works requirements and the steps involved in meeting those requirements have been made more explicit.
Please download the Guidelines from the document library and provide your comments and recommendations via email to aspinfo@essentialenergy.com.au.
We plan to introduce the new and revised procedures progressively, with full implementation by the end of this year. Updates will be provided regularly to all ASPs over the next few months as we implement the new and/or revised procedures.
Changes and where they are located in CEOP2015 are summarised below:
- revised process for the return of redundant materials (P19)
- requirements for switchboard approvals over 100 amps (P21)
- requirements for the return of meters to depots (P22)
- requirements for Level 3 ASPs to attend site to inform the design concept prior to submitting a design for certification (P24)
- requirements for the Level 3 ASPs to submit Site Specific Vegetation Management Plan for approval with their design certification request (P26)
- introduction of project start-up meetings at the commencement of construction for new contestable works projects (P31)
- revised process for requesting protection settings for LV/HV circuit breakers etc. and revised roles and responsibilities for the procurement and application of protection settings (P32)
- requirements for Level 1 ASPs to submit a registered surveyors advice confirming the assets have been installed within an Easement (P32)
- revised process for managing non-conformances on the network including the option of appealing any issued non-conformance (P33)
- revised project close out process including the replacement of the Certificate of Acceptance with the Practical Completion Advice to indicate commencement of the warranty period at completion of construction (P35)
- requirements for Level 1 ASP to submit all required commissioning documentation – as built design, asset data capture and relevant test certificates - two days prior to commission unless the project is determined to be exempt (this will be agreed at project start up) (P36).
To support these revised processes, a number of changes have been made to the CEOF6012 Notice to Commence Construction and to the CEOF6013 Request for Outage:
- Protection Setting Advice (PSA) specifications table removed from CEOF6012 and moved to CEOF6013
- Schedule of Key Dates table updated in CEOF6012 to include a drop down of key project milestones.
The Certificate of Acceptance has been superseded by the Certificate of Practical Completion.
ASP Forums
We also encourage you to attend our ASP Forums, planned for late April early May 2021, and bring to those forums any ideas or suggestions you have regarding the implementation of these processes. More details regarding the 2021 ASP Forums will be provided in the coming weeks.
What do you need to do?
- Review the above and download the latest version of CEOP2015 Contestable Works Guideline from the Document Library.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy – COVID-19 response
What is Happening?
One of our employees who recently attended a venue in Byron Bay last night tested positive for COVID-19. The employee had checked into the venue, isn’t displaying any COVID-19 symptoms and has followed our COVID-19 protocols and all directions from NSW Health.
We are in close communication with the employee to provide support and employees identified as close contacts have been informed and are currently isolating.
Given these events Essential Energy is making some immediate changes to our operations today. This includes:
- Closure of the Ewingsdale (Byron Bay), Ballina and Lismore depots for additional cleaning of premises and vehicles. No employees, contractors or ASPs are to enter these three depots, under any circumstance, until further notice
- Any redundant materials must be stored correctly and can be returned to an appropriate & open depot
- All planned outages in Ballina, Ewingsdale and Lismore have been postponed for the rest of this week
- Prohibition of movement between Essential Energy locations for the two weeks until 14 April.
Visitors to any Essential Energy site must check in using a QR code and we are using this detail to contact all people who have visited the Ballina, Ewingsdale and Lismore depots since the weekend. We are also working with NSW Health to ensure they have any further information they need.
The safety of our people and the community is our highest priority, and we believe the steps we have taken are necessary to minimise the impact and spread of COVID-19. These steps are designed to ensure we can continue to operate the network safely and ensure staff are available to respond to fault and emergency situations.
We will continue to monitor the situation closely, including NSW Health and government advice. Further information will be provided as required. If you have any questions please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Essential Energy customer research
In the next few days, you may receive an invitation to participate in a survey from WoolCott Research and Engagement, on behalf of Essential Energy.
The aim of this survey is to seek feedback from our customers and partners on a number of proposed improvements we are considering as part of our program of continuous improvement, which includes projects such as the BetterConnect program and Customer Journey Mapping.
We encourage you to participate, and look forward to receiving your feedback.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Delays with Design Information Packages
A recent influx of Design Information Applications (DIA) has resulted in a backlog and associated processing delays.
We are putting plans in place to process your requests as soon as possible.
To help ensure your DIA is processed with minimal delay, please make sure you include all relevant details and attach documents applicable to the type of project:
- Electrical Concept plan
- Full details of your project in the ‘description of works’ field
- Survey or DP plans
- Staging plans
- Notice of Determination / DA
- Photos
Please submit your application via the BetterConnect portal or Contestable Works inbox.
In the meantime, we apologise for any inconvenience current processing delays may cause.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update on the ASP Connections and Quality Manager role
What is Happening?
Further to our communication on 24 September 2020 we would like to provide an update on the ASP Connections and Quality Manager role.
Hamish Wheatley will take on the role of Acting ASP Connections and Quality Manager from 1 March 2021. We would like to thank Kevin Miller for his contribution while in this role over the past 6 months.
You can contact Hamish via email hamish.wheatley@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Safety Alert – SA-85-21_ASP Wooden Pole Failure on Jinker in transit
What is Happening?
During transit, one of two condemned wooden poles being transported on a Jinker trailer failed, and part of the pole was ejected. The operator did not notice that only the butt of the pole remained on the Jinker until he arrived back at the depot. Workers located the ejected pole section approximately 15km from the depot.
This incident follows another recent incident as reported in Safety Brief 961_ASP Pole Failure on Jinker in Transit.
Safe loading of vehicles and restraint of loads are critically important in preventing injury to people and damage to property.
This High Potential Incident puts workers, members of the public and other motorists that we share the roadways with at risk.
What do you need to do?
- Download and review Safety Alert – SA-85-21_ASP Wooden Pole Failure on Jinker in Transit located on the Document Library and Essential Engagement.
- Communicate this information to relevant members of your organisation.
- View this communication via Essential Engagement at engage.essentialenergy.com.au/ASP.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Safety Brief - SB-961_ASP Pole Failure on Jinker in Transit
What is Happening?
During transit, a worker transporting a square concrete pole on a Jinker trailer heard a large bang. Looking in the rear-view mirror, he saw that the concrete pole had snapped in half and come off the Jinker.
Pole parts came into contact with a semi-trailer travelling in the opposite direction. The truck suffered damage and, while no person was injured, this incident had the potential to cause life-threatening injuries.
The pole was being replaced and was not condemned. No visual damage to the pole was evident when it was being removed or loaded prior to transit. The pole was loaded on the passenger side centre groove of the Jinker and was well secured with correctly rated and serviceable equipment. The operator completed the prestart checks required and the load was inspected prior to transport.
What do you need to do?
- Download and review Safety Brief – SB-961_ASP Pole Failure on Jinker in Transit located on the Document Library and Essential Engagement.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Safety Brief - SB-963_ASP Cutting Conduits Reminder
What is Happening?
Endeavour Energy has notified Essential Energy of multiple incidents of network workers receiving electric shocks or arc flash burns while accessing cable ducts in trenches in recent weeks.
Endeavour Energy’s HSE Alert and Essential Energy’s updated Safety Brief relating to cutting of conduits when working on or near our network can be downloaded from the Document Library and Essential Engagement.
What do you need to do?
- Download and review Safety Brief – SB-963_ASP Cutting Conduits Reminder Endeavour Alert located on the Document Library and Essential Engagement.
- Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au
Who's Listening
-
Phone 02 6933 5956 Email hamish.wheatley@essentialenergy.com.au
Essential Connections
Information
- Briefing – CEOM7098 issue 16 - Underground Design manual changes (382 KB) (pdf)
- Bushfire Priority Zone Transition BFP ASP Comms (101 MB) (mp4)
- Asset Testing and Commissioning Refresher - ASP Training Enrolment Guide (962 KB) (pdf)
- Composite Pole Journey and FAQ's (694 KB) (pdf)
- Essential Energy - Digital Identification User Guide.pdf (1.87 MB) (pdf)
- Policy/Documents
- Safety Briefs/Alerts
- Essential Connections Portal Preview (1.21 MB) (mp4)
Construction News
-
2024
- CN24-12 CEOM7104.20 Construction Standard Update - Pole Substation Fuse Crossarms Assemblies (138 KB) (pdf)
- CN24-11 Composite Pole CEOM7103 Stay Standards Update (151 KB) (pdf)
- CN 20-10 Correct Transformer Connections (469 KB) (pdf)
- CN24-10 CEOM5005 Chamber Substation Design and Construction Manual Update (154 KB) (pdf)
- CN24-09 11-22kV Schneider RM6 Switchgear Changes (1.52 MB) (pdf)