Level 3 ASPs
Level 3 ASPs design overhead and/or underground distribution and Sub-Transmission network assets. If you need further information or support, please email aspinfo@essentialenergy.com.au.
Important Document Links:
Click here for the Design and Certification Officer Contact List
Level 3 ASPs design overhead and/or underground distribution and Sub-Transmission network assets. If you need further information or support, please email aspinfo@essentialenergy.com.au.
Important Document Links:
Click here for the Design and Certification Officer Contact List
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
2024-25 Bushfire Danger Period Awareness
What is Happening?
With the bushfire season commencing, it’s important to understand and incorporate risk mitigation strategies into our work activities to minimise potential impacts of bushfire on the community and comply with relevant legislation.
The official bushfire danger period for 2024-2025 commenced from 1 September 2024 in the Local Government Areas (LGAs) listed below.
The official bushfire danger period is expected to commence in remaining LGAs from 1 October 2024.
You and your customers can learn about bushfire and management strategies
The Get Ready Weekend, organised by the Rural Fire Service in NSW, aims to prepare locals for bush fire season with events in 500 locations. Main events are on 21-22 September 2024. Contact your local brigade for event details and check the related links for more information on fire preparedness and risk.
Please note: There may be a requirement for Essential Energy to review and possibly suspend requested outages in certain situations if bushfires hazards are severe.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 9: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Tuesday 17 September 2024, Wednesday 18 September 2024 and Thursday 19 September 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 8: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Thursday 12 September 2024, Friday 13 September 2024 and Monday 16 September 2024.
Please note, no notification has been received from the ETU for Saturday 14 September 2024 and Sunday 15 September 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 7: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Friday 6 September 2024 and each consecutive day up to and including Wednesday 11 September 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 6: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Tuesday 3 September 2024 and each consecutive day up to and including Thursday 5 September 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 5: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Thursday 29 August 2024 and each consecutive day up to and including Monday 2 September 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 4: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
Essential Energy has not been notified of any form of protected industrial action for tomorrow, Friday 23 August.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Saturday 24 August 2024 and each consecutive day up to and including Wednesday 28 August 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Updated Essential Energy Connection Policy
What’s happening?
We’ve updated our Connection Policy CEOP2513.06 to align with emerging network and customer requirements.
Effective from 1 July 2024, the updated policy applies to all customers seeking to connect or alter an existing connection – including regulated Stand-Alone Power Systems (SAPS) – to Essential Energy’s distribution system under Chapter 5A of the National Electricity Rules.
We’ll provide further updates and advice as we implement the updated requirements.
Key updates include:
- clarity on situations where works which would normally be provided on a contestable basis may be classified as non-contestable
- clarity on when Essential Energy may provide financial contribution towards a connection augmentation
- thresholds for regulated SAPS
- provision to reduce an approved connection size through consultation and in good faith, in alignment with our recently released Model Standing Offers.
What do you need to do?
- Communicate this information to relevant members of your organisation.
- Review the updated Connection Policy on Document Library.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 3: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Wednesday 21 August 2024 and Thursday 22 August 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
-
You cannot leave comment in this blogpost unless you are a part of the project panel.
Update 2: Electrical Trades Union Protected Industrial Action at Essential Energy
As per our communications from 6 August 2024, the Electrical Trades Union (ETU) provided notice to Essential Energy of its intention to commence protective industrial action effective from 8 August 2024.
The ETU has notified Essential Energy of further proposed protective industrial action commencing on Saturday 17 August 2024 and each consecutive day up to and including Tuesday 20 August 2024.
Potential Impacts
The planned industrial action is likely to create unavoidable disruptions for ASPs, contractors and customers through the possible postponement of planned work. ASPs will receive notice of planned work being postponed on the morning of the job. Notice will be provided through a phone call or email that morning.
Any job that is postponed will need to be resubmitted via the Essential Connection Portal. For projects not being administered via the Essential Connections Portal, you will need to complete and submit a ‘Request for Planned Outage’ form CEOP6013 via contestableworks@essentialenergy.com.au.
What do you need to do?
Communicate this information to relevant members of your organisation.
Further Information
If you need further information, please email aspinfo@essentialenergy.com.au.
Who's Listening
-
Phone 02 6933 5956 Email hamish.wheatley@essentialenergy.com.au
Essential Connections
Digital Asset Management
-
What's New?
-
Getting Started
-
01 Getting Started - what you need to access Neara our network model and Lidar data (759 KB) (pdf)
-
02 How to log in to Neara and access our Network Model and Lidar data (994 KB) (pdf)
-
03 Level 3 Access Request to Neara (19.5 KB) (xlsx)
-
04 Getting Started with Neara (61.8 MB) (mp4)
-
05 Request access to Essential Energys network model and LiDAR data for a given area (105 MB) (mp4)
-
-
General Navigation of Neara
-
01 General Navigation of Neara (3.99 MB) (pdf)
-
02 Mouse Controls and Keyboard Shortcuts - video (112 MB) (mp4)
-
03 Customise Neara screenlayout and workspace (102 MB) (mp4)
-
05 Searching by an Asset Label or an Asset ID (102 MB) (mp4)
-
04 Search in Neara by location (74.8 MB) (mp4)
-
06 Finding a Design (34.6 MB) (mp4)
-
07 Using the Libraries in Neara (78 MB) (mp4)
-
08 Properties Panel (132 MB) (mp4)
-
-
Understanding LiDAR
-
Overhead Design
-
01 A 28-Step Guide to using Neara and Essential Energys Network Model for ASPs (3.09 MB) (pdf)
-
02 Creating an Overhead Design with Neara (2.98 MB) (pdf)
-
03 Guidelines for using Essential Energys Foundations Checks (2.23 MB) (pdf)
-
04 Overhead Design Buttons (117 MB) (mp4)
-
05 Adding a Stay (107 MB) (mp4)
-
06 Using the Environments Spreadsheet (48.5 MB) (mp4)
-
07 Adding a Transformer and Associated Pole Substation (61.6 MB) (mp4)
-
08 How to Use EE Attached Crossings Checks (49.1 MB) (mp4)
-
09 How to use the clearance report (61.8 MB) (mp4)
-
10 Strength Checks (121 MB) (mp4)
-
11 Designing Side Stays in Neara (965 KB) (pdf)
-
12 Guidelines for Essential Energys Swing angle Check in Neara (1.12 MB) (pdf)
-
13 Flag is loaded in master model template (7.04 MB) (mp4)
-
-
Automated Overhead Construction and Conductor Schedules
-
Underground Design
-
Section 1_ Introduction and Update
-
Section 2_ Using the UG Tools
-
Section 3_ Design Example and Pulling Calculation
-
Section 4_ Voltage Drop Calculations
-
How to Use the Underground Design Tools in Neara (2.95 MB) (pdf)
-
Neara Underground Design - Voltage Drop Calculations (445 KB) (pdf)
-
Neara Underground Design Example - How to Design Underground Reticulation for a New Residential Estate (10.1 MB) (pdf)
-
How To Set The Coefficient of Friction in Neara (1.58 MB) (pdf)
-
Neara UG - Voltage and Current Calculations_update (661 KB) (pdf)
-
Underground Design Example (993 KB) (zip)
-
-
Additional Neara Resources
Information
-
Briefing – CEOM7098 issue 16 - Underground Design manual changes (382 KB) (pdf)
-
ASP Underground Manual update session Aug 2024 (312 KB) (pdf)
-
Bushfire Priority Zone Transition BFP ASP Comms (101 MB) (mp4)
-
Essential Energy - Digital Identification User Guide (1.87 MB) (pdf)
-
Safety Briefs/Alerts
-
Policy
-
Essential Connections Portal Preview (1.21 MB) (mp4)