Level 3 ASPs

Level 3 ASPs design overhead and/or underground distribution and Sub - transmission network assets.

  • Proactive discussions, engagement and insights from Level 3 Accredited Service Providers;
  • Critical information updates; and
  • Other useful and relevant information.

If you need further information or support, please email aspinfo@essentialenergy.com.au.

Important Document Links:

Level 3 ASPs design overhead and/or underground distribution and Sub - transmission network assets.

  • Proactive discussions, engagement and insights from Level 3 Accredited Service Providers;
  • Critical information updates; and
  • Other useful and relevant information.

If you need further information or support, please email aspinfo@essentialenergy.com.au.

Important Document Links:

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Update to Neutron Design Tips

    Essential Energy has updated the Neutron Design Tips and can be accessed from Essential Engagement.

    1. Access via Essential Engagement Level 3 ASPs.
    2. Select Neutron widget located on the left-hand side of the page.
    3. Click on More for step-by-step instructions.
    4. Click on Neuton Design Tips
    5. Unzip the file
    6. Copy the pdf files to C:\Program Files (x86)\Essential Energy\Neutron on your local computer.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Changes in Easement documentation and requirements

    What is Happening?

    The following Essential Energy policies have been updated to reflect legislative changes, a general review of easement requirements and changes in easement document processing:

    • CEOF9091 – Submission of Easement Documents includes the ECN or Case Number
    • CEOF6274b – Creation of Easement Customer Deed includes electronic signature provisions
    • CEOF6274c – Creation of Easement Landowner Deed includes electronic signature provisions
    • CEOF6496 – Operational Form – Creation of Easements for Services refers to the Essential Connections Portal
    • CERM8046.01 – Execution of easement documentation procedure guide reflects the new Essential Connections process
    • CEOP8046 – Easement Requirements has various and significant amendments, including:
      • requirement to lodge easement documents via the Essential Connections Portal
      • removal of Clauses 5.2.2 e & d
      • removal of clause 5.5
      • amendment of Clause 5.2.2 to provide that easements are required irrespective of land size
      • inclusion of easement dimensions for a 33kv elongated pad mounted substation
      • updated landowner consent form requirements, and
      • removal of outdated references.

    Please refer to each of the above documents to review the changes. Please also note that while CEOF6274b & CEOF6274c have been updated and are available for use, it is Essential Energy’s preference that CEOF6274f - Agreement for Creation of Easement is used where possible.

    What do you need to do?

    1. Communicate this information to relevant members of your organisation.
    2. Update your templates via the Document Library.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Register now for Essential Energy’s ASP Zoom forums – 28 & 30 November 2023

    What is Happening?

    Essential Energy’s November ASP engagement forums will be held via Zoom. In this round, we’ll be covering a range of topics including:

    • Safety
    • Standards – Updates to the overhead and underground manuals, as well as Construction News and transitioning to composite poles
    • Contestable Design – CEOM7001 Construction Plan Requirements, New Earthing Guide and tips for Neara
    • Improvements to surveyor’s advice
    • Updates to our easement policies
    • Essential Connections –the platform, upcoming construction and commissioning roll out, next steps for CEOP2015 Terms and Conditions for Contestable Works (Guidelines) and process changes.

    We encourage you to participate in these forums. You’ll have the opportunity to discuss our plans and initiatives, and to ask questions, make suggestions and raise issues with Essential Energy team members.

    Dates and Times

    Date

    Time

    Link

    Tuesday 28 November 2023

    5.00 – 7.00 pm

    Register here

    Thursday 30 November 2023

    9.00 – 11.00 am

    Register here

    A confirmation email will be sent to you with the Zoom meeting link once you have registered.

    What do you need to do?

    1. Select the session time above that suits you and reserve your spot.
    2. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    2023-24 Bushfire Danger Period

    What is Happening?

    Essential Energy recognises the importance of incorporating management strategies crucial to mitigating the risk and impact of bush fire on the community and ensures that the effects of its work activities on bushfires are minimised and comply with the relevant legislation.

    In response to past bush fire events which resulted in a devastating loss of life and property, the NSW Government introduced legislative changes to ensure bushfire matters are considered in the development and maintenance processes within our industry. At present, all new development on bush fire prone land must comply with Planning for Bush Fire Protection 2019 which sets out the basis for all bushfire planning and bushfire protection measures.

    The spring 2023 bushfire outlook issued by the Australasian Fire Authorities Council (AFAC) emphasises the need for immediate community and business preparedness. Australia's climate has changed since last spring, with a transition to higher temperatures and lower rainfall predicted by the Bureau of Meteorology. This shift follows years of above average rainfall during La Nina seasons.

    Be Prepared

    Each of us should have a bushfire survival plan in place and be ready, even if the time never comes. Download the Hazards Near Me app and be notified when fires occur within your area.

    There may be a requirement for Essential Energy to review and possibly suspend requested outages in certain situations if bushfires hazards are severe.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Surveyors Advice Requirements – Additional Information

    What is Happening?

    We have received feedback on the challenges being faced when a job requires surveyor's advice. As a result, we have undertaken working groups with ASPs and Surveyors and shared the first steps on 9 October 2023. To recap we have updated the CEOF2579 - Surveyor’s Advice, surveyors now have the option to provide a stamped asset location survey plan instead of a letter.

    To further assist we would like to suggest that you consider the following to help you commence construction within the desired timeframe:

    • Customer or ASP engages the Surveyor early in the project.
    • Surveyor pegs out the boundaries and asset locations for the constructor.
    • Construction works are completed within the pegged boundaries.
    • When practicable for underground assets, the trench is left open until the Network Assurance Facilitator (NAF) can visually sight the cable/conduits and confirm the assets are being constructed within the pegged boundaries/easement at mid-construct (where applicable.
    • Arrange for the Surveyor to attend site (prior to backfilling) to sight and confirm location of installed assets.
    • Provide detailed photos that clearly show peg locations relative to the trench or cable installation – use a measuring device to provide scale in the photo.

    As a reminder, it is a requirement of CEOP2015 - Contestable Works Guidelines that asset locations are confirmed by survey to be located within an easement area, or within the road reserve and Essential Energy’s asset allocation. It is very important that the assets are installed as per the certified design so as to avoid safety issues or legal disputes in the future. To ensure a safe, reliable distribution network, our assets need to be protected.

    If you are unable to engage a surveyor for a specific job, please speak to your local Network Assurance Facilitator (NAF) to discuss exceptional circumstances, this will be escalated and considered on a case-by-case basis.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Christmas and New Year Planned Outages and Contestable Works 2023/24

    What is Happening?

    To minimise the disruption to customers during the Christmas / New Year period, no planned interruptions with a customer impact will be scheduled from 18 December 2023 to the 1 January 2024 and will resume on 2 January 2024.  

    We will have limited resources to undertake Contestable Works during the same period with business resuming as normal from 2 January 2024.  Essential Connections will still be available for submissions; however, limited resources will be available to process requests.

    What do you need to do?

    1. Review your planned interruption schedule for the dates above and work with your nominated Local Depot Switching Resource to reschedule where required.
    2. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Essential Connections fix for Draft Applications

    What is Happening?

    Essential Energy has listened to feedback from ASPs and EC and has created a Submit button for applications with a ‘Draft’ status.

    You can now resume, complete, and submit draft applications by clicking on the new Submit button.

    If you continue to experience any issues, please contact aspinfo@essentialenergy.com.au.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Update to Surveyors Advice

    What is Happening?

    The Surveyors Advice letter (CEOF2579) has been updated to align with the feedback from the ASP Focus Group and the Surveyors Consultation Group.

    The Surveyor now has the option to provide a copy of this letter on their letterhead or alternatively provide a stamped Asset Location Survey plan.

    The Asset Location Survey Plan is a survey/plan with red lines marked on it by the surveyor, showing where the electricity assets have been installed.

    Thank you to those who provided feedback and potential solutions on this matter. Essential Energy is committed to working with you to improve our processes.

    What do you need to do?

    1. Download the latest copy of Surveyors Advice Letter (CEOF2579) from the Document Library
    2. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Update: Essential Energy’s Digital Identification is now live for ASPs

    What is happening?

    On the 5 September 2023 Essential Energy communicated that we would be transitioning from physical identification cards to a fully Digital ID solution.

    We are now communicating to you to announce the solution will be implemented and going live on the 4 October 2023 from 10am.

    The Digital ID solution will enable individuals to authenticate their identity online without the time and effort required to physically collect, handle, and store important documents. Once verified, this will allow Essential Energy to issue individual Digital ID’s more efficiently and securely.

    The solution is a 3-part application:

    1. IdentityONE – solution for issuing digital IDs.
    2. CaptureME – integrates with IdentityONE where users will upload their photo id and verification documents.
    3. IDmobile – installed on your smartphone, providing a digital version of your traditional card.

    What to except

    • From 4 October 2023, Essential Energy will issue individuals with a One Time Password and instructions to self-enrol in in the Digital ID using CaptureMe. The email will be sent from: idmodle.support@uniocard.com.au. As of Monday 9th October they will start coming from captureme@essentialenergy.com.au.
    • On receipt, individuals are to follow the instructions on how to upload individual identification and photo and submit the request.
    • Essential Energy will action the request and issue an email with instructions on how to install IDmobile App and the Digital ID.
    • Individuals will need to download ID mobile app onto their device and access their digital credentials.
    • Once you have your Digital ID, existing physical cards are to be returned to Essential Energy Security, PO Box 5730, PORT MACQUARIE NSW 2444 for secure destruction.

    We understand that transitioning to the new system will require adjustments and we appreciate your support and cooperation during this process. We believe the new solution will significantly enhance Essential Energy’s ability to manage authorisation when working on or near Essential Energy's network.

    Privacy

    • Essential Energy is mandated to meet strict compliance requirements to protect users’ privacy and security, and control against fraud.
    • All information and data collected by Essential Energy is classified as ‘Protected Data’. All protected data will be stored on IT infrastructure that is physically located in Australia. The data is only accessible from within Australia, by authorised personnel, and will not be exported outside Australia. The Digital ID solution meets Australian legislation requirements for data storage and Essential Energy own the IdentityONE Server. Users' personal information is not held by identityONE.
    • Once verified, all identity documents are disposed of securely by Essential Energy and in accordance with Privacy and Personal Information Protection Act 1998.
    • For more information, refer to the Essential Energy Privacy Policy.

    What do you need to do?

    1. Expect an email from idmodle.support@uniocard.com.au. As of Monday 9 October they will start coming from captureme@essentialenergy.com.au.
    2. A ‘How to guide’, Digital Identification User Guide is available to assist you with transitioning to the new way of doing business.
    3. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email Essential Energy Security at eesecurity@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Soft Asset Label new return process

    A new process has been put together to use the CEOF6708 Asset Label Request Form (Return Stock Section) to allow you to return soft labels via the Portal for projects that have an ECN/ST number.

    Please follow the below procedure:

    • Create Asset Label Case as per normal procedure.
    • Select Return Label Option and enter quantity of labels to be returned.
    • Complete Return to Stock section of CEOF6708 Asset Label Request Form.
    • Attach CEOF6708 Asset Label Request Form to the Asset Label case.
    • Submit the request. Asset Label case will be assigned to the Asset Label Queue and completed via the normal process.

    Older projects that do not have a current ECN/ST number and require soft asset labels to be returned will need to follow the below procedure:

    1. Complete Return to Stock section of CEOF6708 Asset Label Request Form.
    2. Submit CEOF6708 Asset Label Request Form via email to contestableworks@essentialenergy.com.au.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

Page last updated: 17 May 2024, 03:54 PM