Southlakes and Surrounds: Network Upgrade

In parts of Dubbo and the surrounding communities, we're making some big upgrades to our high voltage electricity network which supports homes, businesses, industry and the mining sector - from Wellington through Dubbo to Cobar and beyond. This will help us keep providing you with a safe, reliable, and resilient power supply. It will also allow us to connect new loads and renewable energy sources to the network.
One of the major changes you'll notice is the replacement of some of our existing timber and concrete power poles. The new poles will be taller and made of steel, meaning they’ll look different to the poles that you see now. We'll also be stringing new overhead wires. These significant visual changes are part of our efforts to improve the network.
Our local Essential Energy teams, along with contractors, traffic controllers, and specialists, will be carrying out these major works. We're working in many locations and will do our best to minimise disruptions to the community. Over the next 12 months, you might experience some power outages, general construction activities, and occasional road closures - we’ll have traffic control in place. Customers impacted by power outages will receive prior notification.
Please follow along here for all the latest news, project updates and information.

In parts of Dubbo and the surrounding communities, we're making some big upgrades to our high voltage electricity network which supports homes, businesses, industry and the mining sector - from Wellington through Dubbo to Cobar and beyond. This will help us keep providing you with a safe, reliable, and resilient power supply. It will also allow us to connect new loads and renewable energy sources to the network.
One of the major changes you'll notice is the replacement of some of our existing timber and concrete power poles. The new poles will be taller and made of steel, meaning they’ll look different to the poles that you see now. We'll also be stringing new overhead wires. These significant visual changes are part of our efforts to improve the network.
Our local Essential Energy teams, along with contractors, traffic controllers, and specialists, will be carrying out these major works. We're working in many locations and will do our best to minimise disruptions to the community. Over the next 12 months, you might experience some power outages, general construction activities, and occasional road closures - we’ll have traffic control in place. Customers impacted by power outages will receive prior notification.
Please follow along here for all the latest news, project updates and information.
-
Network Upgrade Works to Recommence in August
Share Network Upgrade Works to Recommence in August on Facebook Share Network Upgrade Works to Recommence in August on X (formerly Twitter) Share Network Upgrade Works to Recommence in August on Linkedin Email Network Upgrade Works to Recommence in August linkIn August, the second stage of the network upgrade works in the Southlakes area will commence. This will involve three key pieces of work:
- standing poles;
- stringing conductors (wires) and
- removing old poles.
These works will result in some noise; dust, traffic disruptions (as outlined below) and increased vehicles in the area including cranes and elevated work platforms (cherry pickers). We’ll work to minimise these impacts wherever possible.
Traffic management will be in place from 17th August to 11th September 2026, between 7am and 6pm Monday to Saturday. Traffic Management staff will be in position on the following streets:
Argyle Avenue, Boundary Road, Wheelers Lane, Macquarie Road, Holmwood Drive, Crossroads Drive, and Paterson Road
For any other significant road closures, residents will be advised closer to the time.
Please feel free to reach out to the Land and Community team on 02 6883 4444 or email us on landandcommunity@essentialenergy.com.au should you have any questions.

In August, the second stage of the network upgrade works in the Southlakes area will commence. This will involve three key pieces of work:
- standing poles;
- stringing conductors (wires) and
- removing old poles.
These works will result in some noise; dust, traffic disruptions (as outlined below) and increased vehicles in the area including cranes and elevated work platforms (cherry pickers). We’ll work to minimise these impacts wherever possible.
Traffic management will be in place from 17th August to 11th September 2026, between 7am and 6pm Monday to Saturday. Traffic Management staff will be in position on the following streets:
Argyle Avenue, Boundary Road, Wheelers Lane, Macquarie Road, Holmwood Drive, Crossroads Drive, and Paterson Road
For any other significant road closures, residents will be advised closer to the time.
Please feel free to reach out to the Land and Community team on 02 6883 4444 or email us on landandcommunity@essentialenergy.com.au should you have any questions.

-
Revegetation of Southlakes Park
Share Revegetation of Southlakes Park on Facebook Share Revegetation of Southlakes Park on X (formerly Twitter) Share Revegetation of Southlakes Park on Linkedin Email Revegetation of Southlakes Park linkTo safely accommodate the new power poles, some vegetation within the existing electricity easement at Southlakes Park needed to be removed. Around 60 trees and shrubs were identified for removal to ensure safe distances are maintained between vegetation and the powerlines.
Over the past 12 months, we have worked closely with the community and other stakeholders to help shape the park’s future landscape. Local residents provided valuable feedback on the selection of new native trees and shrubs, which will be planted in areas away from powerlines. As part of this commitment, 100 native trees and shrubs will be planted to help enhance shade, support local birdlife and improve the park environment.
Community members also helped identify a number of existing trees that may be retained. These trees will be reassessed once construction of the new power poles is complete.
The visualisations below show how the area is expected to look following construction, including the new power poles and future native plantings.

To safely accommodate the new power poles, some vegetation within the existing electricity easement at Southlakes Park needed to be removed. Around 60 trees and shrubs were identified for removal to ensure safe distances are maintained between vegetation and the powerlines.
Over the past 12 months, we have worked closely with the community and other stakeholders to help shape the park’s future landscape. Local residents provided valuable feedback on the selection of new native trees and shrubs, which will be planted in areas away from powerlines. As part of this commitment, 100 native trees and shrubs will be planted to help enhance shade, support local birdlife and improve the park environment.
Community members also helped identify a number of existing trees that may be retained. These trees will be reassessed once construction of the new power poles is complete.
The visualisations below show how the area is expected to look following construction, including the new power poles and future native plantings.

-
Here's what you can expect the new poles to look like
Share Here's what you can expect the new poles to look like on Facebook Share Here's what you can expect the new poles to look like on X (formerly Twitter) Share Here's what you can expect the new poles to look like on Linkedin Email Here's what you can expect the new poles to look like linkSteel poles will be used to replace existing concrete poles and in rural areas, the H-pole structures, to support the upgraded network.
The final pole design will depend on local site conditions, engineering requirements and environmental considerations. Most poles are expected to be between 28 and 34 metres high, and pole locations, heights and foundation designs will be confirmed following:
survey works
geotechnical investigations
environmental assessments
detailed engineering design.
Typically, the project will use dual-circuit 132kV structures, with concrete footings, strung on both sides of the poles, as pictured below.

Steel poles will be used to replace existing concrete poles and in rural areas, the H-pole structures, to support the upgraded network.
The final pole design will depend on local site conditions, engineering requirements and environmental considerations. Most poles are expected to be between 28 and 34 metres high, and pole locations, heights and foundation designs will be confirmed following:
survey works
geotechnical investigations
environmental assessments
detailed engineering design.
Typically, the project will use dual-circuit 132kV structures, with concrete footings, strung on both sides of the poles, as pictured below.

-
Some of the equipment we'll be using
Share Some of the equipment we'll be using on Facebook Share Some of the equipment we'll be using on X (formerly Twitter) Share Some of the equipment we'll be using on Linkedin Email Some of the equipment we'll be using link- Prime movers/Semi trailers
- Drilling rigs
- Cranes
- Elevated Work Platforms
- Excavators/Backhoes
- Stringing equipment
- Pole bores
- Traffic signs
- Temporary fencing

- Prime movers/Semi trailers
- Drilling rigs
- Cranes
- Elevated Work Platforms
- Excavators/Backhoes
- Stringing equipment
- Pole bores
- Traffic signs
- Temporary fencing

-
Glare
Share Glare on Facebook Share Glare on X (formerly Twitter) Share Glare on Linkedin Email Glare link
When new galvanised steel power poles are installed, their shiny surface can cause temporary glare.
Natural dulling occurs over time as the galvanised steel poles are gradually exposed to environmental elements such as sunlight, rain, and wind. This leads to a thin layer of zinc oxide and other compounds forming on the surface, creating a matte, grey finish that significantly reduces glare. This process is known as patination, and enhances the pole’s resistance to corrosion, offering a protective barrier without the need for chemical treatments or coatings.
Glare from steel poles is a challenge that all electricity networks face and prior to construction we explored treatment options such as dulling agents, painting, and vinyl wrapping to reduce glare.
Although dulling agents can reduce initial glare, they ultimately produce the same result as natural weathering. Applying a treatment to the poles being installed in Dubbo was found to have a significant impact on project costs without offering a lasting improvement over what would otherwise occur naturally.
Applying paint to galvanised steel poles introduces significant maintenance and environmental concerns. During transportation and installation, painted surfaces can be easily scratched or chipped, compromising both the appearance and the protective qualities of the finish. Over time, exposure to the elements causes the paint to degrade and flake, detracting from the visual amenity of the pole and potentially creating a pollution risk.
Vinyl wrapping was also investigated. Moisture can become trapped between the wrap and the metal surface, creating an ideal environment for corrosion to develop, undermining the pole’s structural integrity and reducing its lifespan. Vinyl wraps are also known to be targets for graffiti, leading to further maintenance and aesthetic challenges. The adhesive used to secure the wrap may also deteriorate over time, resulting in peeling or bubbling, which detracts from the pole’s appearance.
After considering these options, we have determined that allowing the poles to weather naturally provides best balanced outcome for managing glare, asset life, and cost to consumers. Natural weathering minimises environmental impact, ensures lasting durability, and resolves glare issues over time. We do recognise that the initial glare from new galvanised steel poles has caused inconvenience for the community, and we sincerely appreciate your patience and understanding as the weathering process takes place.

When new galvanised steel power poles are installed, their shiny surface can cause temporary glare.
Natural dulling occurs over time as the galvanised steel poles are gradually exposed to environmental elements such as sunlight, rain, and wind. This leads to a thin layer of zinc oxide and other compounds forming on the surface, creating a matte, grey finish that significantly reduces glare. This process is known as patination, and enhances the pole’s resistance to corrosion, offering a protective barrier without the need for chemical treatments or coatings.
Glare from steel poles is a challenge that all electricity networks face and prior to construction we explored treatment options such as dulling agents, painting, and vinyl wrapping to reduce glare.
Although dulling agents can reduce initial glare, they ultimately produce the same result as natural weathering. Applying a treatment to the poles being installed in Dubbo was found to have a significant impact on project costs without offering a lasting improvement over what would otherwise occur naturally.
Applying paint to galvanised steel poles introduces significant maintenance and environmental concerns. During transportation and installation, painted surfaces can be easily scratched or chipped, compromising both the appearance and the protective qualities of the finish. Over time, exposure to the elements causes the paint to degrade and flake, detracting from the visual amenity of the pole and potentially creating a pollution risk.
Vinyl wrapping was also investigated. Moisture can become trapped between the wrap and the metal surface, creating an ideal environment for corrosion to develop, undermining the pole’s structural integrity and reducing its lifespan. Vinyl wraps are also known to be targets for graffiti, leading to further maintenance and aesthetic challenges. The adhesive used to secure the wrap may also deteriorate over time, resulting in peeling or bubbling, which detracts from the pole’s appearance.
After considering these options, we have determined that allowing the poles to weather naturally provides best balanced outcome for managing glare, asset life, and cost to consumers. Natural weathering minimises environmental impact, ensures lasting durability, and resolves glare issues over time. We do recognise that the initial glare from new galvanised steel poles has caused inconvenience for the community, and we sincerely appreciate your patience and understanding as the weathering process takes place.
-
Construction to commence soon in South Lakes
Share Construction to commence soon in South Lakes on Facebook Share Construction to commence soon in South Lakes on X (formerly Twitter) Share Construction to commence soon in South Lakes on Linkedin Email Construction to commence soon in South Lakes linkIn March / April 2026, we will be we will be replacing existing timber and concrete power poles with new, taller steel power poles and stringing new overhead wires in the Southlakes region (the area indicated in the Section 4 to 5 map below). The works will take place between 7.00am and 6.00pm Monday to Friday, and 8.00am to 1.00pm on Saturdays, conditions permitting. The works are expected to be completed by November 2026.
What you can expect:

- You’ll see a range of machinery and equipment, including drill rigs, trucks, excavators and cranes being used. There’ll also be elevated work platforms/cherry pickers in operation and equipment used to string wires between power poles.
- Some noise and dust are expected from construction activities. We’ll work to minimise this wherever possible
- There’ll be an increase in vehicle activity while crews are on site. Traffic management will be in place to maintain access for residents and provide safety of the public and workers.
- For safety reasons, there will be times where power will need to be temporarily interrupted while the work is completed. Residents affected by planned outages will receive Essential Energy's standard outage notification advising the dates and times of outages affecting them, closer to the outage dates.
- When new galvanised steel power poles are installed, their shiny surface can cause temporary glare. Natural dulling occurs over time as they are exposed to sunlight, rain, and wind.
- To keep the network safe and maintain reliability, we’ll be working with Dubbo Regional Council to remove some vegetation and replace with new vegetation where suitable.
We will be hosting a community drop-in session at the shade structures in Southlakes Park (between Southlakes Parade and Boundary St) on Saturday 14th February from 9am to 2pm. Complete this form to register your attendance: Southlakes Community Drop-in Session Registration – Fill in form and keep an eye on this website for further details
In March / April 2026, we will be we will be replacing existing timber and concrete power poles with new, taller steel power poles and stringing new overhead wires in the Southlakes region (the area indicated in the Section 4 to 5 map below). The works will take place between 7.00am and 6.00pm Monday to Friday, and 8.00am to 1.00pm on Saturdays, conditions permitting. The works are expected to be completed by November 2026.
What you can expect:

- You’ll see a range of machinery and equipment, including drill rigs, trucks, excavators and cranes being used. There’ll also be elevated work platforms/cherry pickers in operation and equipment used to string wires between power poles.
- Some noise and dust are expected from construction activities. We’ll work to minimise this wherever possible
- There’ll be an increase in vehicle activity while crews are on site. Traffic management will be in place to maintain access for residents and provide safety of the public and workers.
- For safety reasons, there will be times where power will need to be temporarily interrupted while the work is completed. Residents affected by planned outages will receive Essential Energy's standard outage notification advising the dates and times of outages affecting them, closer to the outage dates.
- When new galvanised steel power poles are installed, their shiny surface can cause temporary glare. Natural dulling occurs over time as they are exposed to sunlight, rain, and wind.
- To keep the network safe and maintain reliability, we’ll be working with Dubbo Regional Council to remove some vegetation and replace with new vegetation where suitable.
We will be hosting a community drop-in session at the shade structures in Southlakes Park (between Southlakes Parade and Boundary St) on Saturday 14th February from 9am to 2pm. Complete this form to register your attendance: Southlakes Community Drop-in Session Registration – Fill in form and keep an eye on this website for further details
-
Progress Update 17 July 2025
Share Progress Update 17 July 2025 on Facebook Share Progress Update 17 July 2025 on X (formerly Twitter) Share Progress Update 17 July 2025 on Linkedin Email Progress Update 17 July 2025 linkThis article has been archivedAs we continue to make our way south through Keswick drilling holes, we've been able to commence standing new poles where concrete foundations have cured around Birch Avenue and Hennessy Drive.
See some pictures below of the new poles.


As we continue to make our way south through Keswick drilling holes, we've been able to commence standing new poles where concrete foundations have cured around Birch Avenue and Hennessy Drive.
See some pictures below of the new poles.


-
Work zone maps and impacts
Share Work zone maps and impacts on Facebook Share Work zone maps and impacts on X (formerly Twitter) Share Work zone maps and impacts on Linkedin Email Work zone maps and impacts linkThis article has been archived















-
Senior Community Engagement Specialist
Phone 0410 404 707 Email jilliankirwan.lee@essentialenergy.com.au
- Geurie Energy Hub | Planning Portal - Department of Planning and Environment
- Geurie Energy Hub to Maryvale Solar Farm Energy Hub | Department of Planning and Environment
- Forest Glen Energy Hub to Dubbo South Energy Hub | Department of Planning and Environment
- Geurie to Wellington | 132kV Upgrade | Department of Planning and Environment