Electrical Contractors


  • Proactive discussions, engagement and insights from Electrical Contractors;
  • Critical information updates; and
  • Other useful and relevant information.

If you need further information or support, please email aspinfo@essentialenergy.com.au


  • Proactive discussions, engagement and insights from Electrical Contractors;
  • Critical information updates; and
  • Other useful and relevant information.

If you need further information or support, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Update on the ASP Connections and Quality Manager role

    supporting image

    Further to our communication on 17 August 2020 we would like to provide an update on the ASP Connections and Quality Manager role.

    Kevin Miller will continue as the Acting ASP Connections and Quality Manager until 1 March 2021. You can contact Kevin via email kevin.miller@essentialenergy.com.au.

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Update on How to Return Redundant Assets to Depots

    supporting image

    Background

    Recently we’ve experienced instances where redundant assets, including meters, have been returned to Depots without prior arrangement, causing significant delays for Depot workers and Accredited Service Providers (ASPs).

    What is changing?

    To comply with heightened social distancing and safety practices in our Depots the document “Warehouse Fright Protocol” (previously shared with Level 1 ASPs) has been updated.

    An additional document, “Timber Pole Management COVID-19 Protocol”, has also been created to keep everyone safe.

    It is important that all ASPs and Electrical Contractors (ECs) arrange a specific time to return any redundant materials as described in these documents. Scheduling an agreed time is necessary to protect the safety of both our ASP partners, ECs and our employees.

    CEOP2015 Contestable work guidelines (available on the Document Library) details our requirements in the section “Return of redundant materials”. Please ensure that you follow these and other previously communicated guidelines.

    What do you need to do?

    1. Follow the protocols described in the beforementioned documents, which can be found on the Document Library.
    2. Ensure that you arrange a return time with the relevant Depot Resource Supervisor or Regional Stores Officer.
    3. Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Changes to the ASP Connections and Quality Manager Role

    supporting image

    Following successful implementation of the first stage of automating the network connections process through our BetterConnect design portal, David Wilson will be acting in the Head of Commercial Services Role for a minimum of 12 months to allow Alistair Fletcher, Head of Commercial Service, to oversee roll-out of the new system across the end to end connections process.

    To ensure continuing support for Accredited Service Providers and Electrical Contractors, our Network Assurance Supervisor, Kevin Miller, is now your point of contact as Acting ASP Connections and Quality Manager. Kevin’s email is kevin.miller@essentialenergy.com.au.

    We will provide you with further information when it is available.

    In the meantime, please continue to contact your local NAF/SNAF (Network Assurance Officer) and send any general enquiries to aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Price Schedule for Ancillary Network Services AER Price Increase 1 July 2020

    supporting image

    What is Happening?

    From 1 July 2019, the Australian Energy Regulator (AER) introduced new regulatory charges for Ancillary Network Services. As an Accredited Service Provider (ASP), Authorised Person (AUP) or Electrical Contractor (EC), you would be aware of the current Ancillary Network Services charges applicable to services you provide to your customers.

    The AER has approved the new regulatory charges for Essential Energy’s Ancillary Network Services to be implemented from 1 July 2020.

    You can read more about Essential Energy’s pricing for Ancillary Network on our website at: Essential Energy > Our Network > Network Pricing and Regulatory Reporting > Network Pricing.

    What do you need to do?

    1. Review the 2020-21 Pricing Schedules for Ancillary Network Services available on the Essential Energy website
    2. Accredited Service Providers, Authorised Persons and Electrical Contractors should consider pricing changes when preparing quotations for customers regarding future work
    3. Communicate this information to relevant members of your organisation

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Service Main Voltage Rise Criteria

    supporting image

    What is happening?

    Essential Energy is committed to providing customers who wish to install low-voltage embedded generation access to the network where it does not compromise quality, safety and reliability of supply to other network users.

    To facilitate this, we have revised our assessment criteria for connection of embedded generators to the low-voltage network.

    Effective Monday 15 June 2020 our revised criteria requires that voltage rise on Service Mains is maintained within 1% (in accordance with clauses '1.12.3.4' & '8.6.13' of the NSW Service Installation Rules). This will enable Essential Energy to maintain voltage at the point of connection at 253V.

    Exemptions

    Application of exemption clause '8.6.13.1' will not be accepted when it results in an increase of voltage on the Service Mains greater than 1%. We will consider exemption where combined voltage in the Consumer Mains and Sub Mains is limited to 2% (as per clause '3.3.3' of AS/NZS4777.1-2016).

    Alternative compliance mechanisms may include applicants proposing Service Mains augmentation or imposing export limits to their generator systems in order to maintain the voltage rise within the Service Mains to 1% (as per clause '8.6.3' of the NSW Service Installation Rules, and noting that export limits will not impose a limit on the capacity of generator systems for self-consumption).

    At this time, the standing automatic approval for energy export of 5kW per connection point for urban, and 3kW per connection point for rural customers remains in place.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au.

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Low Voltage Customer Switchboards with ratings of more than 100A per phase

    supporting image

    Background

    The NSW Service and Installation Rules stipulate that low voltage connections greater than 100 Amps must be reviewed by the electricity distributor.

    To facilitate compliance and ensure consistency, Essential Energy is centralising our review process.

    What is changing?

    From today, all connection applications for low voltage customer switchboards with ratings of more than 100 Amps per phase (new/modified and with or without CT metering) are to be submitted with a proposed load, single line diagram and power factor correction details (if applicable), and a completed “Switch Board Compliance Statement”, CEOF7819 can be found on the Document Library.

    All requests must be submitted via switchboard.review@essentialenergy.com.au, using the standard naming convention – Address_Customer Name_Submitting Company Name_Submission Version (Example - 2 Southern Cross Dr Ballina_ Marelex_V1).

    Following receipt of your submission, Essential Energy will assess the documentation and respond as ‘appears compliant’ or if non-compliant, as ‘rejected’.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Essential Energy Customer Satisfaction Research

    supporting image

    As part of Essential Energy’s commitment to continuous improvement, we are seeking feedback from our customers and business partners about how easy we are to do business with.

    Feedback received from ASPs and Electrical Contractors to date has assisted us in ensuring that the capabilities and quality of our products and services are meeting your expectations now and into the future.

    Over the next few weeks, a representative from Woolcott Research & Engagement may contact you to participate in a survey that will assess your satisfaction with our service delivery and operational performance. Your input is needed to help Essential Energy optimise customer outcomes and ensure our operations are aligned to your needs.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Safety Brief - Electrical Safety Rules - Issue 17

    supporting image

    What is happening?

    The Electrical Safety Office (ESO) has completed a minor review and update of CEOP8030 Electrical Safety Rules that is now available on Essential Energy’s Document Library as Issue 17. Details of the changes are listed in the revisions section of the document.

    What do you need to do?

    Communicate this information to relevant members of your organisation.

    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Draft Price Schedule for Ancillary Network Services - AER Price Increase 1 July 2020

    supporting image

    What is Happening?

    From 1 July 2019, the Australian Energy Regulator (AER) introduced new regulatory charges for Ancillary Network Services. As an Accredited Service Provider (ASP), Authorised Person (AUP) or Electrical Contractor (EC), you would be aware of the current Ancillary Network Services charges applicable to services you provide to your customers.

    Effective 1 July 2020, there will be a price increase of approximately 2.6 per cent on all Ancillary Network Services.

    You can read more about Essential Energy’s draft pricing for Ancillary Network on our website at: Essential Energy > Our Network > Network Pricing and Regulatory report > Network Pricing. Additional information will be made available once the 2020-21 pricing schedules have been finalised and approved by the AER.

    What do you need to do?

    1. Review the 2020-21 ‘draft’ Pricing Schedules for Ancillary Network Services available on the Essential Energy website
    2. Accredited Service Providers, Authorised Persons and Electrical Contractors should consider pricing changes when preparing quotations for customers regarding future work
    3. Communicate this information to relevant members of your organisation.


    Further Information

    If you need further information, please email aspinfo@essentialenergy.com.au

  • You cannot leave comment in this blogpost unless you are a part of the project panel.

    Safety Brief CEOP2377 Equipotential and Personal Protective Bonding Issue 6

    supporting image

    What is happening?

    The Electrical Safety Office recently completed a review of Operational Procedure: CEOP2377 Equipotential and Personal Protective Bonding.

    Updates now incorporate the recent amendments made to CEOP8030 Electrical Safety Rules and other feedback received from within the business.

    Details of these updates are listed within section 7.0 of CEOP2377 issue 6, now available on Essential Energy’s Document Library.

    Safety Brief 905 - CEOP2377 Equipotential and Personal Protective Bonding Issue 6 is being shared for your information and can be accessed from Essential Energy’s Document Library or Essential Engagement.

    What you need to do?

    Communicate this information to relevant members of your organisation