On 18 June 2020, Construction New 20-03 Installation of Spare Conduits in New Installations was released.
After receiving feedback, Essential Energy has amended underground drawings CEOM7201.02 and CEOM7201.11 to clarify that installation of 25-50mm2 supply cables is permitted in 50mm HD orange conduit. Any spare conduit that is required to be run with the supply cable must be a minimum of 125mm orange conduit.
Please refer to the drawings for conduit part numbers for the installation type.