Tips for completing the Construction Schedule Template
What is happening?
We would like to remind you to use the latest version of the standardised construction schedule template for each project you undertake, you can find this on the Essential Connections Support page. The current version at time of publication is v1.4.14.
It is important that the information you enter into the construction schedule is accurate and to a high quality to ensure the assets are correctly created within Essential Connections. The construction schedule also creates the data capture and test forms that are used in the construction phase of the project.
Construction Schedule tips
When completing the construction schedule, please follow the guides on the instructions page. To help us process submissions more swiftly, please make sure you:
- Refer to the instructions within CEOM7001 Construction Plan Requirements, which articulates the requirements of each schedule
- Use drop-down boxes when available
- Enter alphanumeric characters, numbers, or free text as per the instructions page
- Start at the top of the sheet – do not leave blank rows above your assets
- One asset per line
- Avoid the use of forward slashes
- Use the add row/insert tool, do not manually add rows to a schedule
- Validate the schedule using the construction schedules tab “Validate Schedule”
- Ensure correct ECN project number and Design Submission Case number are populated. Please ensure you include all leading zeros in the design submission case number.
What do you need to do?
- Download the latest version (1.4.14) of the standardised construction schedule template from the Essential Connections support page.
- Submit your completed spreadsheet with every design submission.
- Communicate this information to relevant members of your organisation.