You cannot leave comment in this blogpost unless you are a part of the project panel.
Neara Essential Energy Network Model Geodatum GDA94
Hi All
I have noticed that the Neara network models are located under the old Geodatum GDA94 instead of the latest GDA 2020?
This means that data from surveyors and Neara design plans do not align correctly when the projects are geo-located. This is quite frustrating when we need to align easements and boundaries on plans.
I have queried Neara about this and they have stated that the this is controlled by Essential Energy with their network modelling.
Will the Essential Energy network model be updated to the GDA2020 datum anytime soon?
Thanks