You cannot leave comment in this blogpost unless you are a part of the project panel.

Update on Low Voltage Four Core Breakout Kit

A new low voltage four core breakout kit (Essential Energy Catalogue Number 286 296) has been added to CEOM7004 Standard Contestable (Approved) Materials List for use on the Essential Energy network. It includes a non-glue lined breakout boot and mastic that provides a better moisture seal on the connection.

The relevant CEOM7202 Underground Manual drawings have been updated to reflect the new kit details.

As with most changes to CEOM7004 Standard Contestable (Approved) Materials List there is a 12 month grace period for you to deplete your stock.

What do you need to do?

  1. Familiarise yourself with the new kit and drawings.
  2. Communicate this information to relevant members of your organisation.

Further Information

If you need further information, please email aspinfo@essentialenergy.com.au.



<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>