Community Batteries Goulburn

Share Community Batteries Goulburn on Facebook Share Community Batteries Goulburn on Twitter Share Community Batteries Goulburn on Linkedin Email Community Batteries Goulburn link


FAQs

When will the battery be operational?

The battery must be installed and operational by March 2025.

What are the benefits?

The project ensures the community benefits through: lower electricity bills, access to storage, supporting lower emissions, increasing storage of excess solar energy and taking pressure off the grid.


FAQs

When will the battery be operational?

The battery must be installed and operational by March 2025.

What are the benefits?

The project ensures the community benefits through: lower electricity bills, access to storage, supporting lower emissions, increasing storage of excess solar energy and taking pressure off the grid.

  • Sneak Peek

    Share Sneak Peek on Facebook Share Sneak Peek on Twitter Share Sneak Peek on Linkedin Email Sneak Peek link

    The battery is generally a configuration of six individual cabinets (about the size of a fridge) which are stacked back-to-back in two rows atop a concrete base.

    Below is an example of what they normally look like.

    The battery is generally a configuration of six individual cabinets (about the size of a fridge) which are stacked back-to-back in two rows atop a concrete base.

    Below is an example of what they normally look like.

  • Battery Installation

    Share Battery Installation on Facebook Share Battery Installation on Twitter Share Battery Installation on Linkedin Email Battery Installation link

    We're looking to install the battery towards the end of October 2024. We're placing the battery alongside some of our existing electricity assets near the roundabout of Geoghegan Drive and Gibson Street. Construction and installation will take approximately two weeks.

    What should you expect during the construction period?

    • Around three staff on site from our contractor Ventia
    • Trucks, utes and trailers, making beeping noises when reversing
    • A crane
    • Traffic control when lifting batteries into place
    • Use of power tools

    Indicative location of battery

    We're looking to install the battery towards the end of October 2024. We're placing the battery alongside some of our existing electricity assets near the roundabout of Geoghegan Drive and Gibson Street. Construction and installation will take approximately two weeks.

    What should you expect during the construction period?

    • Around three staff on site from our contractor Ventia
    • Trucks, utes and trailers, making beeping noises when reversing
    • A crane
    • Traffic control when lifting batteries into place
    • Use of power tools

    Indicative location of battery

  • Welcome

    Share Welcome on Facebook Share Welcome on Twitter Share Welcome on Linkedin Email Welcome link

    Welcome to Essential Energy Community Batteries Goulburn project page.

    You will find useful information and the latest news here. Make sure to register so you can add comments and ask questions.

    Cheers,

    Josh

    Welcome to Essential Energy Community Batteries Goulburn project page.

    You will find useful information and the latest news here. Make sure to register so you can add comments and ask questions.

    Cheers,

    Josh

    You need to be signed in to add your comment.

Page last updated: 23 Sep 2024, 03:11 PM